mirror of
https://github.com/rcourtman/Pulse.git
synced 2026-11-29 01:08:56 +01:00
Spec 10 skipped on every run: it issued and revoked real licences through
the production licence server and needed an admin token no workflow had.
Its selectors had also rotted against the current plan page ("Existing
purchases", "Activate Key", "No Pro license is active"), so licence
activation, the path every paying customer takes, had no running browser
coverage.
The in-memory Ed25519 issuer behind the Organization provisioning job now
mints a second ephemeral key whose grants carry the Pro plan. The spec
pastes that key into the plan page's license recovery field, checks the
Pro state in the UI and the entitlements API, and clears it back to
Community through the UI. The offline CI job runs it with the same
wrapper, so no production credentials or signing material are involved.
Spec 11's plan-panel matcher drops the labels that no longer exist.
Contract-Neutral: Adds a CI step running an existing spec through the existing offline issuer wrapper; E2E image distribution and installability are unchanged.
67 lines
3.7 KiB
Markdown
67 lines
3.7 KiB
Markdown
# Offline Organization provisioning
|
|
|
|
This fixture is only for a source-built, non-release Community backend on the
|
|
same host as Playwright. It is not an installation workaround or a replacement
|
|
for private runtime implementations. No production account, licensing service,
|
|
admin endpoint or signing material is used.
|
|
|
|
After the normal locked installs in `tests/integration`, `frontend-modern` and
|
|
`internal/cloudcp/portal/frontend`, and Chromium installation, run from
|
|
`tests/integration`:
|
|
|
|
```sh
|
|
PULSE_E2E_USE_LOCAL_BACKEND=true node scripts/with-offline-entitlements.mjs \
|
|
node scripts/run-playwright.mjs \
|
|
--config=playwright.multi-tenant-diagnostic.config.ts \
|
|
--grep 'Scenario 1:|create, update, member manage' --workers=1 --retries=0
|
|
```
|
|
|
|
The wrapper generates an ephemeral Ed25519 issuer, binds it to loopback and
|
|
keeps it alive for the complete managed backend/browser lifecycle. The backend
|
|
is freshly built at a unique temporary path. Its development trust root and
|
|
licensing URL point to the issuer; signature bypass and mock mode are false.
|
|
The issuer has no outbound requests, redirect responses or production fallback.
|
|
It implements only activation and authenticated status/refresh, rejects legacy
|
|
exchange, and binds independent installation credentials to fingerprints.
|
|
Repeated activation for one fingerprint is idempotent. Issuer state lives for
|
|
this run, including backend restarts; restarting the issuer requires a fresh
|
|
run, not reusing an old activation directory. Never export fixture keys, grant
|
|
JWTs, installation credentials or backend runtime-state files as artifacts.
|
|
|
|
The Organization spec activates default through the authenticated API before
|
|
each scenario. `createOrg` independently activates each created organisation
|
|
with explicit scope headers. Capability assertions require `multi_tenant`,
|
|
exclude Community's private `rbac`, and check the security contract's
|
|
`sessionCapabilities.demoMode=false`. Offline activation suppresses the old
|
|
billing.json profile writer; there is no direct capability injection.
|
|
No offline key means the existing unentitled and other test paths are unchanged.
|
|
|
|
The issuer also mints a second key, `PULSE_E2E_OFFLINE_PRO_ACTIVATION_KEY`,
|
|
whose grants carry the Pro plan. Each key binds its own installation per
|
|
fingerprint. `tests/10-v6-license-activation.spec.ts` pastes it into the
|
|
Settings plan page, checks the Pro state in the UI and API, and clears it
|
|
back to Community; without the wrapper it skips. The same CI job runs it:
|
|
|
|
```sh
|
|
PULSE_E2E_USE_LOCAL_BACKEND=true node scripts/with-offline-entitlements.mjs \
|
|
node scripts/run-playwright.mjs tests/10-v6-license-activation.spec.ts \
|
|
--project=chromium --workers=1 --retries=0
|
|
```
|
|
|
|
The managed backend is a community build, so the plan page also shows the
|
|
"Pro runtime missing" notice a public-build customer sees after activating.
|
|
|
|
The separate CI provisioning job runs two narrow scenarios and issuer boundary
|
|
tests. It does not change stable/probation/quarantine membership. Passing it is
|
|
not Organization sharing acceptance, private-runtime RBAC coverage, full-suite
|
|
acceptance or release qualification. To investigate another Organization
|
|
scenario, use its explicit grep in the same diagnostic config and retain its
|
|
result separately. The Web owner judges those user-interface outcomes.
|
|
|
|
Local proof on 9 September 2026: two Chromium scenarios passed (3.8s test time)
|
|
on the final wrapper, with real authenticated activation and created-org scope;
|
|
13 focused Node cases passed for signatures, three distinct identities,
|
|
cross-identity/fingerprint/credential rejection, unsupported routes, ephemeral
|
|
keys, wrapper lifecycle and refusal of remote/release inputs. No hosted run or
|
|
release delivery is established by this proof.
|