1. Keep TestInstallSHNASBootOwnersQuiesceBeforeRecoveryErasure serial at
the top level in scripts/installtests/install_sh_test.go. Commit
63023ca8e3 mistakenly added top-level t.Parallel(), violating the
documented invariant that AgentNASLiveTeardown runs serially before
parallel fixtures. Because AgentNASLiveTeardown inspects the real
machine-wide process table (ps -ax), overlapping with parallel
sibling tests that spawn pulse-agent or shell commands mentioning
start-pulse-agent.sh, autorun.sh, or /boot/config/go caused
read_nas_agent_removal_processes to classify them as unknown and fail
quiesce_nas_agent_for_removal with exit code 1 (Build and Test run
46146982565, job 140987777407). The 22 modelled AgentNASTeardown
subtests remain parallel.
2. Cut Backend tests (rest-0 and rest-1) wall time — the slowest Go
package in Build and Test (~452s in rest-0 and ~379s in rest-1 on
main run 46149511431) — by adding top-level t.Parallel() to 43
audited, global-free slow tests across 17 unclaimed
internal/monitoring/*_test.go files (~345+ serial root test-seconds).
- Many already used t.Parallel() on their subtests (guest agent and
Windows polling contracts, PVE/PBS storage/inventory budget and
response tests, severity delivery, archive writer, and alert replay
tests) without top-level t.Parallel().
- Parallelize the four 15-17s notification restart continuity tests
using isolated t.TempDir() and httptest servers while keeping the
two t.Setenv("PULSE_DATA_DIR") tests serial.
- Parallelize TestPMGBackupReadsAvoidUnrelatedFleetCopy only when
raceEnabled is true (isolated go test -race=false subprocess),
keeping non-race testing.AllocsPerRun strictly serial.
Zero production code, test assertions, or timeout budgets changed.
Contract-Neutral: Test-only scheduling fix for scripts/installtests live NAS teardown and parallelization of isolated internal/monitoring tests; no production or subsystem contract changes.
Change-source: pulse-maintainer