New version-bound patch targets are not protected main. Do not admit a direct target-ref dispatch that omits the reviewed immutable preparation; retain existing historical governed branch behaviour.
Contract-Neutral: Enforce the existing reviewed-snapshot requirement on the new patch path; release contents and historical dispatch contracts are unchanged.
Change-source: pulse-maintainer
Rebuild selected whole main merge results over the current stable tag, retain only reviewed release controls and release metadata, and reject unrelated source before a payload exists. Preserve reviewed snapshot provenance, existing minor source rules and historical branch mappings. Exercise real Git conflicts, successor patches and drift rejection in canonical CI.
Change-source: pulse-maintainer
Release secrets are repository-wide today, so any workflow on any branch can
read them. The plan is to move them into a `release` environment that admits
only `main` and post-merge dispatch refs. Today's dispatch refs cannot serve:
`release-candidate/*` also names unmerged release PR heads.
The snapshot check now also accepts `release-dispatch/<packet>`. It must name
a merged PR whose head is `release-candidate/<packet>` at the dispatched
commit, with the same source-line and ancestry checks as before. The
existing `release-candidate/*` dispatch keeps working, so the host dispatcher
can switch over later. Every snapshot cut after this lands carries the check.
This change validates identity only. Restricting who can create or move
`release-dispatch/*` refs is a separate repository ruleset, and the contract
says the namespace carries no extra trust until that ruleset is active.
Continuous development must not change the source of an admitted release.
Allow the workflow to run at the qualified preparation PR head after its
normal merge, verifying exact source and workflow identity, canonical PR
provenance, and ancestry in the governed release line. Later branch commits
remain outside that release. Document the immutable-candidate contract and
verify source workflow compatibility before qualification.
Validation: snapshot identity and workflow contract tests passed, including
wrong-head, wrong-base, fork, unmerged and unbound dispatch rejection. The
existing release workflow promotion policy test also passed.