The bundled OR-list could hide a failed HTTPS probe behind a successful HTTP retry, while generated Compose ignored the image probe entirely. Select the executable image probe explicitly and propagate its exit; retain the HTTP fallback only for older images without it. Exercise both real Compose producers with the shipped probe, protocol controls and custom-image failure, without operating Docker or existing deployments.
Change-source: pulse-maintainer
The first-install generator replaced customised Compose files and overwrote its one recovery backup on every rerun. Refuse existing Compose paths before Docker or output writes, retain regular environment files, and prevent output clobbering. Report configuration preparation rather than an installation that was never run.
Contract-Neutral: Restore intended setup idempotency and saved-deployment preservation; no generated Compose schema, runtime policy, image default, upgrade API or lifecycle contract changes.
Change-source: pulse-maintainer
The release train explicitly compares the full beta range with the previous stable. Accept that supported base as well as the default previous numbered prerelease, while rejecting missing, ambiguous and unrelated comparison bases.
Contract-Neutral: Align release packet checks with the existing metadata contract. No public install or runtime contract delta.
The second beta's preparation pull request failed Backend tests
(TestCurrentPrereleasePacketTracksInstallMetadata): the changelog the
release metadata tool wrote said it describes the changes since
v6.6.0-beta.1, and the test expected v6.5.0. previousPrereleaseVersion
only understood -rc.N, so for beta.2 it reported no predecessor and the
test fell back to the previous stable. The tool names the predecessor in
the pre-release's own stage, alpha, beta or rc, N-1.
Do the same in the helper: rc.2 follows rc.1 and beta.2 follows beta.1,
while the first of a stage has no predecessor even when an earlier stage
shipped. Pin it with a table test, because beta.1 passed without ever
exercising the second-beta case.
Run against the beta.2 preparation snapshot with this change, the whole
installer test package and the release policy suite pass.
Contract-Neutral: Test helper only; no release, install or customer contract changes.
Releases are cut from the head of main since 2 October, but three things
still made every release need hand edits before it could pass:
- the control plane routed 6.5.x to the abandoned release/v6.5 line;
- main lacked the published 6.4.4 to 6.4.6 packets, so rollback
derivation on main still found 6.4.1;
- the packet tests pinned prose from old 6.4.x notes (named
highlights, issue numbers, one release's mobile decision) and the
per-release sentences in the deployment-installability contract,
which changes several times a day on main.
Map 6.5 to main, carry the published packets over from release/v6.4,
and keep the packet tests to what the release tooling generates: version
pins, packet pointers, required sections and the rollback, signing and
mobile sentences.
Contract-Neutral: Release routing and release-packet test scope only; no runtime, install or public contract changes.
The install-metadata contract encoded only the emergency no-RC stable-patch shape. A stable patch with a same-version RC promotes the exercised candidate (promotion_mode stable-rc-promotion), so the contract must assert that shape and derive the rollback target from the last published stable.
previousStablePatchVersion hardcoded only v6.4.2 as unpublished, so v6.4.5 rolled back to the never-published v6.4.4. Add v6.4.3 and v6.4.4, which only ever shipped as prereleases, so v6.4.5 resolves to the published v6.4.1 that the promotion resolver also derives.
Add stablePatchPromotedPrerelease to detect the same-version candidate from the retained release notes, and branch the stable-patch install-metadata tests between the emergency and RC-derived shapes. Unit tests pin the rollback derivation and the candidate detection.
Change-source: pulse-maintainer
Open the v6.4.3 candidate line from main. The v6.4.2 tag was staged on
2026-08-31 but never activated: its release run was cancelled after the
private Pro build failed the compiler memory gate, so the latest published
stable is still v6.4.1. This candidate carries the complete v6.4.2 change
set plus the corrections landed since that tag, including the stale PBS
Backup Running state (#1815), the Windows Unified Agent auto-update 404
(#1820), and shared-token same-hostname agent identity collapse (#1753).
Packet: VERSION, compose and install-docker defaults, Helm chart metadata,
release notes with a declined visual plan, changelog, pointer docs and
the shipped docs mirror, and the deployment-installability cutoff note.
Rollback target is v6.4.1 and the mobile decision is no-mobile-impact.
Tests: the packet tests now describe the 6.4.3 train, v6.4.2 is recorded
as an unpublished stable so it is never derived as the previous stable or
rollback target, and the Python v6.4.2 notes expectation matches the
phrase the notes actually use.
Advance the immutable candidate after rc.7 failed its backend gate, keep stable rollback on v6.3.2, and refresh release, Docker, Helm, and mobile-compatibility metadata.
Change-source: pulse-maintainer
Package durable alert lifecycle recovery, richer scheduling and routing, capacity forecasting, host disk policy, external availability monitoring, and governed action verification for the next prerelease.
Change-source: pulse-maintainer
Package the standalone PBS detail restoration, SMART CRC growth alerts, consolidated alert policy, bounded event queries, and Go 1.26.7 toolchain for the next prerelease.
Change-source: pulse-maintainer
Package the atomic API-token deletion fix, alert delivery evidence, reducer-backed lifecycle cutover, separated agent install tokens, and filesystem history feedback for the next release candidate.
Change-source: pulse-maintainer
Advance the governed install, Docker, and Helm metadata together; add the RC9 release packet for the post-RC8 notification, lifecycle, and resource-read fixes; and record the existing mobile-candidate compatibility decision.
Fourth candidate on the v6.2.0 line, superseding v6.2.0-rc.3 and still following stable v6.1.2. This hardening cut includes action recovery, kiosk containment, alert and notification accounting, node-restricted Proxmox storage, container-runtime selection, and host CPU sampling fixes that landed after rc.3. Version pins move to 6.2.0-rc.4 across the repo root, Docker bootstrap defaults, and Helm metadata; stable install pointers remain on v6.1.2 until governed promotion.