The Pro build reran Pulse's whole test suite against the release commit,
39 of the 41 minutes of its test job, although this workflow's own
race-enabled backend_tests already tests that commit. Pass this run's id as
public_release_run_id. The Pro build then tests only the Enterprise suite,
and its signing job waits until this run's backend_tests passes on the same
commit.
The release gate listed only Test names in internal/api, so the seed
corpora of FuzzNormalizeRouteCompatibility and FuzzDecodeSecurityRequestBody
ran only in the Pro build's copy of the suite. List Fuzz and Example names as
pull-request CI already does, and let the shard planner accept them. On the
current tree that adds exactly those two, and both pass.
pulse-enterprise PR 237 declares the input and must merge first: an unknown
dispatch input fails the dispatch.
Candidate preflight found the refreshed CI-only observations had removed two whole-package estimates still consumed by the shared backend queue. Restore those unmeasured historical hints, while preserving the refreshed ordinary CI assignments. Make the TERM-resistant cleanup witness ready before its peer fails, and exercise shipped and reversed fixture orders instead of depending on weight order.
Contract-Neutral: Scheduling hints and causal test-fixture repair only; no product runtime, release rules, required check, coverage, worker envelope, timeout or cleanup assertion is weakened.
Change-source: pulse-maintainer
Retain the failed leader in the cleanup set so its surviving descendants receive the same bounded TERM/KILL signals. Controlled children independently record process-group identity; a failing leader leaves a TERM-resistant descendant for the actual runner to clean. Liveness checks distinguish live execution from a disappearing PID or a dead zombie awaiting init reaping.
Change-source: pulse-maintainer
A controlled Bash probe confirms wait -n returns no-job for an already completed child even though wait PID retains its status. Drain completed task PIDs explicitly and reconcile a completion racing the live-job snapshot. Add actual-helper controls for successful and failing saved statuses, including127; no task is rerun and no missing result becomes a pass.
Change-source: pulse-maintainer
The offline VM exposed a timing race before the real backend suite started. Prove released-capacity admission through an explicit child-start barrier. Failure controls also exposed a descendant missed by recursive process enumeration: give tasks separate process groups and apply bounded TERM/KILL cleanup, including a child deliberately ignoring TERM. Coverage, CPU widths and test deadlines are unchanged.
Change-source: pulse-maintainer
Beta.3 backend job 123003682684 completed its three API shards in 17 minutes but kept the non-API graph on one slot until the 70-minute hosted cancellation. Reuse each finished shard width for source-listed whole packages, start expensive packages first, isolate their data, and retain CPU lease coverage. Preserve the total CPU budget, all race/vet coverage and existing deadlines. Add actual-runner discovery, capacity, failure and cleanup controls.
Change-source: pulse-maintainer